{"id":784,"date":"2021-01-01T10:26:00","date_gmt":"2021-01-01T09:26:00","guid":{"rendered":"https:\/\/cosidra.com\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/"},"modified":"2026-04-28T17:14:55","modified_gmt":"2026-04-28T15:14:55","slug":"special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant","status":"publish","type":"progetti","link":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/","title":{"rendered":"Special foundation and jet grouting works for a Levante Edison power plant"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Works completed:<\/strong><\/h2>\n\n<ul class=\"wp-block-list\">\n<li>8,000 m of jet grouting columns<\/li>\n\n\n\n<li>1,000 m of micropiles<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\"><strong>Project overview<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">Between 2021 and 2023, Cos.Idra carried out a multi-year programme of specialist foundation works at Edison\u2019s Centrale Levante plant in Marghera, on behalf of A.C.R. Reggiani, as part of refurbishment and upgrade activities. The works were delivered in several phases, following the evolving requirements of the site. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" src=\"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-576x1024.webp\" alt=\"\" class=\"wp-image-583\" srcset=\"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-576x1024.webp 576w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-169x300.webp 169w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-768x1365.webp 768w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-864x1536.webp 864w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-1152x2048.webp 1152w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-2-scaled.webp 1440w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\"><strong>Scope of works<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">The activities included jet grouting columns up to \u00d8700 mm, micropiles and specialist drilling works, the supply and installation of steel tubes for Cross Hole testing, core drilling of existing piles, supplementary cement grouting, and targeted completion works on structures and sheet piling. The project also included ancillary operations linked to logistics and grout plant management. <\/p>\n\n<h2 class=\"wp-block-heading\"><strong>Operational challenges<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">The complexity of the project stemmed from the need to work within an active power plant, coordinating with other ongoing activities and adapting the technologies used to requirements that evolved over time. Maintaining a continuous presence on site required considerable operational flexibility and the ability to work on both new and existing structures. <\/p>\n\n<h2 class=\"wp-block-heading\"><strong>Results<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">The combination of jet grouting, micropiles and complementary works supported the different phases of the project while ensuring continuity and responsiveness to changing site requirements.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" src=\"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-576x1024.webp\" alt=\"\" class=\"wp-image-584\" srcset=\"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-576x1024.webp 576w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-169x300.webp 169w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-768x1365.webp 768w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-864x1536.webp 864w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-1152x2048.webp 1152w, https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-3-scaled.webp 1440w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Works completed: Project overview Between 2021 and 2023, Cos.Idra carried out a multi-year programme of specialist foundation works at Edison\u2019s Centrale Levante plant in Marghera, on behalf of A.C.R. Reggiani, as part of refurbishment and upgrade activities. The works were delivered in several phases, following the evolving requirements of the site. Scope of works The [&hellip;]<\/p>\n","protected":false},"featured_media":785,"template":"","meta":{"_acf_changed":false},"categorie-progetti":[83,84],"location-progetti":[110,99],"class_list":["post-784","progetti","type-progetti","status-publish","has-post-thumbnail","hentry","categorie-progetti-jet-grouting","categorie-progetti-micropiles","location-progetti-italy","location-progetti-veneto"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Special foundation and jet grouting works for a Levante Edison power plant - Cos.Idra<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Special foundation and jet grouting works for a Levante Edison power plant - Cos.Idra\" \/>\n<meta property=\"og:description\" content=\"Works completed: Project overview Between 2021 and 2023, Cos.Idra carried out a multi-year programme of specialist foundation works at Edison\u2019s Centrale Levante plant in Marghera, on behalf of A.C.R. Reggiani, as part of refurbishment and upgrade activities. The works were delivered in several phases, following the evolving requirements of the site. Scope of works The [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Cos.Idra\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/p\/COS-IDRA-srl-100091349230763\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T15:14:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-1-scaled.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/\",\"url\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/\",\"name\":\"Special foundation and jet grouting works for a Levante Edison power plant - Cos.Idra\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cosidra.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/edison-marghera-1-scaled.webp\",\"datePublished\":\"2021-01-01T09:26:00+00:00\",\"dateModified\":\"2026-04-28T15:14:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cosidra.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/edison-marghera-1-scaled.webp\",\"contentUrl\":\"https:\\\/\\\/cosidra.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/edison-marghera-1-scaled.webp\",\"width\":1440,\"height\":2560},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cosidra.com\\\/en\\\/homepage\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/cosidra.com\\\/en\\\/progetti\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Special foundation and jet grouting works for a Levante Edison power plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cosidra.com\\\/en\\\/\",\"name\":\"Cos.Idra\",\"description\":\"Fondazioni Speciali, Opere Idrauliche e Marittime Padova\",\"publisher\":{\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cosidra.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/#organization\",\"name\":\"Cos.Idra Srl\",\"url\":\"https:\\\/\\\/cosidra.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cosidra.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/cosidra.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Cos.Idra Srl\"},\"image\":{\"@id\":\"https:\\\/\\\/cosidra.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/p\\\/COS-IDRA-srl-100091349230763\\\/\",\"https:\\\/\\\/www.instagram.com\\\/cos.idra\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/cosidra\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Special foundation and jet grouting works for a Levante Edison power plant - Cos.Idra","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/","og_locale":"en_US","og_type":"article","og_title":"Special foundation and jet grouting works for a Levante Edison power plant - Cos.Idra","og_description":"Works completed: Project overview Between 2021 and 2023, Cos.Idra carried out a multi-year programme of specialist foundation works at Edison\u2019s Centrale Levante plant in Marghera, on behalf of A.C.R. Reggiani, as part of refurbishment and upgrade activities. The works were delivered in several phases, following the evolving requirements of the site. Scope of works The [&hellip;]","og_url":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/","og_site_name":"Cos.Idra","article_publisher":"https:\/\/www.facebook.com\/p\/COS-IDRA-srl-100091349230763\/","article_modified_time":"2026-04-28T15:14:55+00:00","og_image":[{"width":1440,"height":2560,"url":"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-1-scaled.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/","url":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/","name":"Special foundation and jet grouting works for a Levante Edison power plant - Cos.Idra","isPartOf":{"@id":"https:\/\/cosidra.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/#primaryimage"},"image":{"@id":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-1-scaled.webp","datePublished":"2021-01-01T09:26:00+00:00","dateModified":"2026-04-28T15:14:55+00:00","breadcrumb":{"@id":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/#primaryimage","url":"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-1-scaled.webp","contentUrl":"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/04\/edison-marghera-1-scaled.webp","width":1440,"height":2560},{"@type":"BreadcrumbList","@id":"https:\/\/cosidra.com\/en\/progetti\/special-foundation-and-jet-grouting-works-for-a-levante-edison-power-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cosidra.com\/en\/homepage\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/cosidra.com\/en\/progetti\/"},{"@type":"ListItem","position":3,"name":"Special foundation and jet grouting works for a Levante Edison power plant"}]},{"@type":"WebSite","@id":"https:\/\/cosidra.com\/en\/#website","url":"https:\/\/cosidra.com\/en\/","name":"Cos.Idra","description":"Fondazioni Speciali, Opere Idrauliche e Marittime Padova","publisher":{"@id":"https:\/\/cosidra.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cosidra.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cosidra.com\/en\/#organization","name":"Cos.Idra Srl","url":"https:\/\/cosidra.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cosidra.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/01\/favicon.png","contentUrl":"https:\/\/cosidra.com\/wp-content\/uploads\/2026\/01\/favicon.png","width":512,"height":512,"caption":"Cos.Idra Srl"},"image":{"@id":"https:\/\/cosidra.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/p\/COS-IDRA-srl-100091349230763\/","https:\/\/www.instagram.com\/cos.idra\/","https:\/\/www.linkedin.com\/company\/cosidra"]}]}},"_links":{"self":[{"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/progetti\/784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/progetti"}],"about":[{"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/types\/progetti"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/media\/785"}],"wp:attachment":[{"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/media?parent=784"}],"wp:term":[{"taxonomy":"categorie-progetti","embeddable":true,"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/categorie-progetti?post=784"},{"taxonomy":"location-progetti","embeddable":true,"href":"https:\/\/cosidra.com\/en\/wp-json\/wp\/v2\/location-progetti?post=784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}